shock top earth work
Aug 29, 2013
1 min read
Working together with internationally renowned earthworks artist, Stan Herd, our firm helped to deign, engineer, fabricate, and install the first vertical earthwork in downtown San Francisco.
Our metal studio created an aluminum structural system that would allow the massive earthwork to be suspended over 45 feet in the air with no invasive attachments to the exiting building. Over 5000 pounds of aluminum were processed and welded in our Lawrence, Kansas shop, then disassembled and shipped to California to be re-assembled on prominent corner near Giants Stadium.

2013 08 29-san fran 02 2013 08 29-san fran 03 2013 08 29-san fran 04 2013 08 29-san fran 06 2013 08 29-san fran 07 2013 08 29-san fran 08 2013 08 29-san fran 15 2013 08 29-san fran 17 2013 08 29-san fran 26 2013 08 29-san fran 18 2013 08 29-san fran 23 2013 08 29-san fran 24 2013 08 29-san fran 25 2013 08 29-san fran 20 2013 08 29-san fran 27 2013 08 29-san fran 28

Comments